Make your own free website on Tripod.com
JOURNAL PUBLICATIONS
  1. Deb D., 2000, "Analysis of Real-time Shield Pressures for the Evaluation of Longwall Ground Control Problems", Journal of Mines, Metal and Fuels (India), 8 pp.
  2. Molinda G.M., C. Mark and D. Deb, 2000, "Using The Coal Mine Roof Rating (CMRR) to Assess Roof Stability in U.S. Coal Mines", Journal of Mines, Metal and Fuels (India), 25 pp.
  3. Y. P. Chugh, D. Deb, D. Dutta and M. Caldwell, 2000, "SIU Backfills with CCBs and Coal Processing Waste Mixture.", Coal Age Nov. 2000, pp 28 -30.
  4. Park D.W., and D. Deb, 1999, "Longwall Strata Control and Maintenance System - A Stethoscope for Longwall Mining," Mining Engineering, Vol. 51, No.10, pp. 49-53
  5. Park D.W., and D. Deb, 1998, "LoSCoMS: An Interactive Longwall Mining Strata Control and Maintenance System," Mining Engineering, Vol. 50, No. 10, pp. 78-84
  6. Deb D., D.W. Park, Y.M. Jiang, and B. Wells, 1997, "Longwall Control At Shoal Creek," Mining Engineering, Vol. 49, No. 7, pp. 25-30
  7. Park, D.W.,Y.M. Jiang, D. Deb, and R.L. Sanford, 1997, "Monitoring and Prediction of Longwall Instability Using Artificial Intelligence Techniques," SME Transaction Vol. 300, pp. 34-38
  8. Jiang, Y.M., D.W. Park, D. Deb, and R.L. Sanford, 1997, "Application of Fuzzy Set Theory in Evaluation of Roof Categories in Longwall Mining," Mining Engineering, Vol. 49, No. 3, pp. 53-57
CONFERENCE PROCEEDING PUBLICATIONS
  1. Y. P. Chugh, D. Deb, D. Dutta and M. Caldwell, 2000, "Underground Placement of Coal Processing Waste and Coal Combustion By Products Based Paste Backfill for Enhanced Mining Economics", CCB Forum, Morgantown, WV pp: 12 (preprint)
  2. Y.P. Chugh, D. Deb and C.B. Raju, 2000, "Physical and Engineering Properties of Coal Combustion By-Products", CCB Forum, Morgantown, WV, pp 12 (preprint)
  3. Y.P. Chugh, M. Prichard, D. Deb and H. Wilcox, 2000 "Development and Demonstration of CCBs Based Structural Products for Mine Use", CCB Forum, Morgantown, WV, pp 13 (preprint)
  4. Deb D., A.R. Nalla, and K.Saikiran, 2000, "Analysis of Real-time Shield Pressures for the Evaluation of Longwall Ground Control Problems", 129th SME Annual Conference, Salt Lake City, UT, 8 pp. preprint # 00-131
  5. Deb D., J. Ma, and Y.P. Chugh, 2000, "Numerical Analysis of the Effects of Weak Floor on Longwall Ground Control", 129th SME Annual Conference, Salt Lake City, UT, 7 pp. preprint # 00-134
  6. Deb D., 1999, "Effect of Weak Floor on Ground Control at Longwall Face", International Conference on Rock Engineering for Site Characterization, December 6-8, Bangalore, India, (preprint)
  7. Deb D., 1999, "Improvement of Longwall Operation Using Shield Pressure Monitoring", International Conference on Rock Engineering for Site Characterization, December 6-8, Bangalore, India, (preprint)
  8. Deb D. and D.W. Park, 1999, "Improvement of Longwall Safety and Productivity with Real-Time Shield Pressure Monitoring Using LoSCoMS Software", Proceeding of 160th Annual Meeting, Illinois Mining Institute, Collinsville, IL, 46-59 pp.
  9. Deb D., D.W. Park, Y.M. Jiang, and B. Wells, 1998, "Analysis of Mine Geology and Improvement of Longwall Performance Using Continuous Shield Monitoring with LoSCoMS," 127th SME Annual Meeting, Orlando, Florida, preprint #98-123
  10. Park D.W., and D. Deb , 1998, "Longwall Strata Control and Maintenance System - A Stethoscope for Longwall Mining," 127th SME Annual Meeting, Orlando, Florida, preprint #98-12